by Roger Knox - Vernon Morning Star posted Jul 24, 2016 at 1:00 AM


Greater Vernon Water’s 2012 master water plan will not be reviewed by an independent engineer. Regional District of North Okanagan directors voted almost unanimously with a Greater Vernon Water Advisory Committee recommendation not to hire an independent engineer to conduct a peer review as requested by the Citizens for Changes to the Master Water Plan. RDNO directors voted in favour of nine recommendations from the advisory committee, including a scheduled review of the MWP be completed every five-to-10 years or prior to the construction of any significant capital project. The lone dissenter was alternate Vernon director Scott Anderson. “Asking for a peer review is not way out there in left field, it’s something that’s a fairly standard operating procedure,” said Anderson. “With a small investment in a peer review, we’ll potentially save money, gain credibility with the public and do what’s actually expected.” But Vernon director Juliette Cunningham said a review of the plan will take place “each and every time a major investment to the plan happens.” A 2014 referendum to borrow up to $70 million to undertake Phase 1 projects identified in trhe plan failed, which led to the creation of a stakeholder advisory committee to review the MWP. “I’ve sat at every stakeholder meeting with people representing commercial, agricultural, residential and industrial interests,” said Cunningham. “Part of that committee is made up of at least three engineers. “A tremendous amount of work has already been done.” The stakeholder advisory group voted in May to recommend to Greater Vernon Water that Duteau Creek and Kalamalka Lake be maintained as drinking water sources and that two treatment plants remain. It also wants partial separation of agricultural land from treated water primarily in eastern Coldstream. GVAC is also being urged to proceed with filtration at the Mission Hill treatment plant before the Duteau Creek facility. RDNO directors agreed to the recommendations Wednesday. The Citizens for Changes to the Master Water Plan had pushed for a peer review of the water plan, but that request was denied by the stakeholders. The full scope of the master water plan is about $108 million over 50 years but the cost could depend on factors such as government grants and filtration being deferred or not occurring at Duteau. While another referendum is possible, funds could also come from reserves and existing revenue.
========
Don Quixote Comments :
The "recommended chosen" option 2 By SAC Committee is a $111 million dollar expenditure that should have a peer review or an engineering & operational and financing review before it is reincorporated into the master water plan for IHA blessing and approval.

We originally managed to get a Peer Review of Duteau Filtration and that $30,000 study concluded that the cost of this method could reduce the Filtration Costs at Duteau from the $26.5 million Filtration in Option 2 (http://www.rdno.ca/docs/TM10_Financial_Plan_FINAL.pdf ) to between $8 and $10 million for the ultraviolet and scrubbing method as recommended in this peer review. (if approved by IHA)

I asked for a peer review before the last election and referendum and still feel that when we are requiring a $111 million expenditure ( with $26.5 for Duteau Filtration and $30 million for mission Hill Filtration )(in 2022) that we pursue a professional review.
==========
http://vernonblog.blogspot.ca/2016/07/recommendation-not-to-proceed-with.html
PEER REVIEW OF Duteau Filtration:
==========
2015 GVW Annual Water Report: http://www.rdno.ca/docs/2015_GVW__Annual_Rpt.pdf